VA Medical Center – Altoona, PA
MATOC (Multiple Award Task Order Contract) with Altoona VAMC
- Awarded contract to assist in maintenance, repair, and construction in support of the Altoona VAMC
Renovate Radiology
- Upgrade of the Radiology Department in the VAMC
- Completed March 21, 2014
Retro-Commissioning Upgrades
- Provided upgrades to the VA to required for their commissioning; included Mechanical, Electrical, Masonry, and Carpentry Trades
- Under-Going Construction
Provide Security Upgrades Phase I
- Upgraded the VA’s Security systems to include cameras, swipe cards, and screen installation
- Under-Going Construction
Upgrade to Front Desk
- Provided new roll up door for the ER Front Entrance
- Completed September 6, 2013
Upgrades FCA Piping Repairs/Replacement
- Upraded piping and plumbing within the Altoona VAMC
- Completed September 31, 2013
Furnish and Installation of Air Conditioning Unit in Canteen Kitchen
- Installation of new Roof Top AC Unit, Patching of Roof, and Ductwork into Canteen Kitchen Area
- Completed January 21, 2013
FCA Reconfigure Loading Dock Project
- Renovation of Storage Area and Existing Loading Dock area to include installation of a new dock lift and overhead door.
- Completed June 14, 2013
Replace Condensing Unit in Daycre
- New Condensing Unit Upgrade to Daycare Facility
- Completed May 9, 2013
Furnish and Install Patient Lift and Baratic Scales
- Installed New Patient Lifts on the 5th and 6th Floors of the Altoona VA Hospital
- Completed Nov 5, 2012
VA Medical Center – Lebanon, PA
Renovations to Transition Houses for Veterans
- Renovation of two transition houses for local Veterans, upgraded bathrooms and living spaces
- Under Going Construction
VA Medical Center – Batavia, NY
Renovation to Building 3 Call Center
- Upgraded Building 3 to create a new Call Center for the Hospital
- Completed January 30, 2014
Steam Trap Monitoring and Replacement
- Monitored Existing Steam Traps and the Batavia VA and upgraded overall system
- Under Going Construction
VA Medical Center – Canandaigua, NY
Paint Buildings 4 & 6
- Required to paint all interior hallways and rooms in Buildings 4 & 6
- Completed February 15, 2014
Replace Signs on Campus
- Replace Existing Signs on the Canandaigua Campus
- Under Going Construction
Pennsylvania State University-University Park
Renovate Restroom Area of 118 East Area Locker Rooms
- Upgraded restroom facilities at the EALR
- Completed February 15, 2014
Renovation of Warehouse 2
- Upgraded Warehouse II on the PSU Campus; included upgrades to HVAC, Electrical, and Interior Spaces
- Completed November 30, 2013
Community Projects
Point of Fitness
- Upgraded interior partitions at the new Point of Fitness facility in Duncansville, PA
- Completed August 2012
Roaring Spring Sidewalk Replacement
- Upgraded sidewalks on city block in Roaring Spring
- Completed July 2012